
How we work
From call to first steam
6 stages · 6–22 weeks · 0% schedule slips in the past 3 years.
When what happens
Phase
W00W04W08W12W16W20
01Consultation & survey
Week 1
02Contract & design
Weeks 2–3
03Harvest & hand-hewing
Weeks 4–11
04Delivery
Week 12
05On-site assembly
Weeks 13–20
06Handover & training
Weeks 21–22
01Week 1
Consultation & survey
02Weeks 2–3
Contract & design
03Weeks 4–11
Harvest & hand-hewing
04Week 12
Delivery
05Weeks 13–20
On-site assembly
06Weeks 21–22
Handover & training
What we do at each stage
- 01Step 1 of 6
Consultation
We discuss your wishes and visit the site. Free 3D sketch and cost estimate.
- 02Step 2 of 6
Contract
We fix the price. No hidden charges. Transparent estimate for each stage.
- 03Step 3 of 6
Log Crafting
Our craftsmen build your log frame in Siberia. Photos and videos from production. 4-8 weeks.
- 04Step 4 of 6
Delivery
By our own transport from Siberia. Bishkek — 5 days, Almaty — 4 days.
- 05Step 5 of 6
Assembly
Foundation, log frame, roofing. Foreman on call 24/7. Online camera on site.
- 06Step 6 of 6
Handover
Finishing, stove, shelves, doors. 47-point acceptance. Keys + 10-year warranty.
0%Schedule slips · 3 years
47Inspection points per log house
10 летWarranty on workmanship & materials
Ready to start?
Calculate the price and book a 2026 slot