From call to first steam

6 stages · 6–22 weeks · 0% schedule slips in the past 3 years.

Timeline

When what happens

01Week 1

Consultation & survey

02Weeks 2–3

Contract & design

03Weeks 4–11

Harvest & hand-hewing

04Week 12

Delivery

05Weeks 13–20

On-site assembly

06Weeks 21–22

Handover & training

In detail

What we do at each stage

  1. 01Step 1 of 6

    Consultation

    We discuss your wishes and visit the site. Free 3D sketch and cost estimate.

  2. 02Step 2 of 6

    Contract

    We fix the price. No hidden charges. Transparent estimate for each stage.

  3. 03Step 3 of 6

    Log Crafting

    Our craftsmen build your log frame in Siberia. Photos and videos from production. 4-8 weeks.

  4. 04Step 4 of 6

    Delivery

    By our own transport from Siberia. Bishkek — 5 days, Almaty — 4 days.

  5. 05Step 5 of 6

    Assembly

    Foundation, log frame, roofing. Foreman on call 24/7. Online camera on site.

  6. 06Step 6 of 6

    Handover

    Finishing, stove, shelves, doors. 47-point acceptance. Keys + 10-year warranty.

0%Schedule slips · 3 years
47Inspection points per log house
10 летWarranty on workmanship & materials